OPTIMAL EFFICIENCY THROUGH QUALITY INFRASTRUCTURE

  • Exploiting Global Connectivity

  • Designed and Constructed for Maximum Security

  • Opportunity for Enhancement

LET’S TALK

DESIGNED AND CONSTRUCTED FOR MAXIMUM SECURITY

The DP Facilities Mineral Gap Data Center is located in Wise, VA, otherwise known as "The Safest Place on Earth." In addition to its protected mountain location, it's conveniently located outside of the "blast zone," near a large airport, and close to government mission critical locations. The area is also optimal for data security, characterized by the redundancy of power and telecommunication that ensures data will always be covered.

Defend Against External Risks

Our Mineral Gap Data Center enforces anti-terrorism protection. It has enhanced security measures through its designs as a high-strength, pre-cast concrete facility with K-rated, U.S. Department of State certified anti-ram fencing and wedge barriers. Additionally, it has both a perimeter blast berm and counter-IED protective measures.

Defend Against Internal Risks

In addition to standard biometric and key card multi-factor authentication, the Mineral Gap data center ensures security through 24/7/365 on-duty armed security personnel, as well as extensive video and counter-surveillance systems. This data center facility also provides an advanced tactical command center and is NIST 800, SSAE 16 and SOC 1 & SOC 2 compliant.

Get protected from all risks today

Mineral Gap significantly reduces your capital and operating costs with low-cost utility power and an estimated PUE of 1.2.

OPPORTUNITY FOR ENHANCEMENT

REDUCE EXPENSES

Mineral Gap significantly reduces your capital and operating costs with low-cost utility power and an estimated PUE of 1.2. Pairing this with our current substations allow us to be scalable up to 45MW of power enabling you to develop your IT operations as you grow.

SECURE DEVELOPMENT

This secure technology campus provides you with over 200,000 square feet of data center and administrative office space. There are also 50 acres of additional adjacent land that provides for future infrastructure expansion.

LET’S TALK